Clarabelle Mill: Steelcord belt for steep-trough conveying

A specialized Endurasteel Plus configuration for Vale’s nickel and copper ore application, developed around challenging troughing geometry and delivered to site in 15 weeks.

CHALLENGE

Troughing Issues and a Tight Deadline

Vale needed specialized steelcord belting for a conveyor with steep idler angles that had historically caused troughing problems, together with a fast delivery to site.

SELECTION

Steelcord Construction with Transverse Reinforcement

Endurance worked with Vale to develop an Endurasteel Plus configuration incorporating elastic steelcord breakers in the top cover, addressing the application’s troughing and mechanical-protection requirements.

SOLUTION

Installed belt specifications

· Endurasteel Plus
2,400 m 1067 mm ST200 12+7 mm MSHA-2G with rip protection

Our Story

Clarabelle Mill in Sudbury, Ontario, processes ore from Vale’s nickel and copper mines in the surrounding area. Its size-reduction operations include semi-autogenous grinding (SAG), rod and ball mills. In 2018, Vale approached Endurance Belting for a specialized steelcord belt for the site. The request combined a technical challenge in belt troughing with an urgent need for delivery to the operation.

The conveyor’s steep idler angles had historically created troughing issues for the belting. Vale needed a configuration that addressed this geometry while providing reinforcement for the ore-handling duty. Abrasion resistance and rip protection were also identified in the project specification. The task required attention to how the belt would form into the conveyor trough, alongside its tensile construction and protective features. Quick delivery was also an immediate priority for the customer.

Endurance worked with Vale to develop a steelcord belt with transverse steel breakers for the application. The Endurasteel Plus construction incorporated an elastic steelcord breaker within the top cover. This transverse reinforcement adds lateral strength and is designed to help absorb impact loads and resist puncture, ripping and rip propagation. The specified belt was 1067mm wide and ST2000 rated, with 12 mm × 7 mm covers. 2,400m of the belt was installed in the project. The configuration brought together the steelcord carcass and protective reinforcement around the site’s stated requirements.

TALK TO AN EXPERT

Discuss your conveyor direction, conveyed material, cover exposure and performance requirements with Endurance Belting.

    Project Details

    Location
    Ontario · Canada
    Industry
    Mining
    Application
    SAG Mill
    Material Conveyed
    Copper Ore
    Delivery to Site
    15 weeks
    Reinforcement
    Elastic steelcord breaker in the top cover