Grand Paris Line 15: Belting for tight tunnel curves

Endurabore belting for VINCI Construction’s tunneling work in Paris, combining low-modulus construction for curved conveyor routes with a flame-resistant cover specification.

CHALLENGE

Tight curves in tunnel conveying

Excavated soil handling required belting suited to tight conveyor curves, alongside resistance to abrasion and impact and a flame-resistant cover specification for the tunnelling application.

SELECTION

Low-modulus Endurabore construction

Endurabore combined a low-modulus belt design intended to accommodate the project’s curved route with Class A rubber covers, as specified in the internal project record.

SOLUTION

Installed belt specifications

· Endurabore
13,600m x 1000mm NN630/3 5 +3 Class A

Our Story

Grand Paris Line 15 forms part of the Grand Paris Express transport project around Paris. In 2018, VINCI Construction purchased Endurabore belting for its tunneling work on the line. The order comprised 13,600 m of belt, 1000 mm wide, for handling excavated soil. The application required a belt configuration suited to the curved conveyor route and the material-handling conditions within the tunnel.

Tight curves were a defining requirement of this project. The belt needed to accommodate the conveyor’s route while providing the strength required for soil transport. Abrasion and impact resistance were also part of the application’s stated requirements. A flame-resistant cover specification added another consideration for tunneling duty. Together, these needs called for attention to both the belt’s mechanical behaviour and its rubber covers when defining the complete configuration for the project.

Endurabore was designed specifically for tunneling applications. For this project, its low-modulus construction was selected to accommodate tight curves along the conveyor route. The design combined belt strength with impact resistance and the flexibility needed for the application. Class A rubber covers provided the flame-resistant cover specification required for the supply. This brought the route-related requirement and the material-contact requirements into one belt configuration. Endurabore’s application-specific design was central to the selection, supported by Endurance’s recorded experience supplying belting for tunneling projects.

TALK TO AN EXPERT

Discuss your conveyor direction, conveyed material, cover exposure and performance requirements with Endurance Belting.

    Project Details

    Location
    Paris · France
    Industry
    Tunneling
    Application
    Tunnel Conveying with Tight Curves
    Material Conveyed
    Excavated Soil