Grand Paris Line 15 forms part of the Grand Paris Express transport project around Paris. In 2018, VINCI Construction purchased Endurabore belting for its tunneling work on the line. The order comprised 13,600 m of belt, 1000 mm wide, for handling excavated soil. The application required a belt configuration suited to the curved conveyor route and the material-handling conditions within the tunnel.
Tight curves were a defining requirement of this project. The belt needed to accommodate the conveyor’s route while providing the strength required for soil transport. Abrasion and impact resistance were also part of the application’s stated requirements. A flame-resistant cover specification added another consideration for tunneling duty. Together, these needs called for attention to both the belt’s mechanical behaviour and its rubber covers when defining the complete configuration for the project.

Endurabore was designed specifically for tunneling applications. For this project, its low-modulus construction was selected to accommodate tight curves along the conveyor route. The design combined belt strength with impact resistance and the flexibility needed for the application. Class A rubber covers provided the flame-resistant cover specification required for the supply. This brought the route-related requirement and the material-contact requirements into one belt configuration. Endurabore’s application-specific design was central to the selection, supported by Endurance’s recorded experience supplying belting for tunneling projects.